Applemead House, Whimple – Progress

June 27, 2019

At the end of week 3 in the contract, there has been much works carried out, not that this would be that apparent from the outside and the entire building has been stripped internally down to the existing floor slab.

Works on the new foundation for the party walls, new ground floor slab will take up much of the next couple of weeks, before the scaffold is erected, roof taken off and then the concrete planks can be craned in to position.

Some very exciting photos to be shared in the coming months.